News + Events

March 23, 2020

Four Seasons Hotel

Posted by: Nibbi Brothers | Share | Comments Off on Four Seasons Hotel

Located in the heart of downtown San Francisco. Tenant improvement of 4600 sq. ft., featuring a sales experience room and sales gallery, offices, new bathroom and kitchenette with high end finishes, hard wood flooring, wallcoverings, jewel box paneling, hard lid ceiling with trimless lights. The project entailed converting existing hotel service areas into hotel office […]

September 26, 2019

Redwood Oaks Renovation

Posted by: Nibbi Brothers | Share | Comments Off on Redwood Oaks Renovation

Rehabilitation of 36-unit apartment complex that houses low-income families and individuals. interior work (new kitchen, baths, flooring, paint, appliances, bath fans, electrical upgrade) and exterior work (roofs, windows, seismic strengthening, paint, landscape and parking lot improvements) and a new community room building.

September 26, 2019

420 Taylor

Posted by: Nibbi Brothers | Share | Comments Off on 420 Taylor

Located at the intersection of Taylor Street and O’Farrell Street, 420 Taylor is a four-story concrete structure built in the 1940s. The building features a 4th floor roof terrace and a central light which reaches down to the 2nd floor. This project consists of: remodeling existing basement and ground floors, addition of mezzanine, and a […]

February 1, 2019

Confidential Client Tenant Improvement

Posted by: Nibbi Brothers | Share | Comments Off on Confidential Client Tenant Improvement

Nibbi provided tenant improvements to 13,500 sq. ft. of office space at 128 King Street. This historic brick warehouse building is located directly across from AT&T Park. The scope of work included new flooring throughout, new storefront and a kitchenette, new glazing and doors, paint, framing and drywall, plumbing, lighting, lighting controls and general electrical […]

March 21, 2018

Presidio Gorgas Rehabilitation

Posted by: Nibbi Brothers | Share | Comments Off on Presidio Gorgas Rehabilitation

The rehabilitation and adaptive re-use of 4 historic structures on Gorgas Avenue.  Three of the project’s buildings were originally warehouse type structures and the 4th building was an administrative building. The buildings are now open for lease for Office and Health + Fitness uses. The scope of work included installation of new building systems throughout, […]

December 7, 2017

Restoration Hardware Adaptive Reuse / Tenant Improvement

Posted by: Nibbi Brothers | Share | Comments Off on Restoration Hardware Adaptive Reuse / Tenant Improvement

Located at the corner of 20th and Illinois Streets in San Francisco, building 101 at Pier 70 is undergoing substantial rehabilitation and adaptive reuse to house the new Restoration Hardware flagship store. The  70,000 sq.ft. space includes a new green roof pavilion and tenant improvements associated with building-out the interior of the new showroom. The […]

December 7, 2017

Westside Courts Rehabilitation

Posted by: Nibbi Brothers | Share | Comments Off on Westside Courts Rehabilitation

This multi-family wood-frame public housing project, located in the Western Addition neighborhood of San Francisco, consists of 136 units of low-income housing. The nearly 2.6 acre site covers an entire city block. There are 6 three-story buildings and one accessory structure. The renovated Westside Courts features a mixture of housing types and income levels, including […]

August 3, 2016

Pacific Vision Foundation

Posted by: Nibbi Brothers | Share | Comments Off on Pacific Vision Foundation

Tenant improvements to 2 floors, as well as building-wide infrastructure upgrades of an existing 5-story office building on Van Ness Avenue. New facilities include a state-of-the-art surgery center, clinic space, physician offices, conference areas and commercial space. The scope of work includes elevator upgrades, renovation of bathrooms, mechanical penthouse, MEP Utility systems replacement, upgraded building […]

July 20, 2016

RAD – Cal Corridor Phases I & II

Posted by: Nibbi Brothers | Share | Comments Off on RAD – Cal Corridor Phases I & II

Cal Corridor Phases I and II are public housing projects under the Rental Assistance Demonstration (RAD) program that have been substantially rehabilitated. The focus of the rehabilitation was to improve the essential functions of the building including fire and life safety, code compliance and waterproofing. This included replacement of windows, cabinets, flooring and some roofing; painting […]

April 10, 2013

Koret Foundation

Posted by: Nibbi Brothers | Share | Comments Off on Koret Foundation

With the renovation of 607 Front Street now complete, the Koret Foundation has a sleek, new headquarters building located in the Financial District and just two blocks west of the Embarcadero waterfront. Nibbi’s scope of work on 607 Front Street included the historic renovation and seismic upgrade of a two-story brick building and basement built in 1906. Work included […]