Services
QA/QC
Ensuring Quality from the Start
Quality workmanship is significant to Nibbi. We pride ourselves on our reputation, integrity, and innovation. We find this focus on quality during the preconstruction, construction, and post-construction stages result in our success in retaining clients and their repeat business.
Nibbi’s Quality Assurance/Quality Control Department is involved in every project from start to finish and is a liaison between the client and subcontractors/suppliers. Nibbi values our history with repeat clients and looks forward to creating new relationships with prospective clients, and it is the quality of our work product makes this possible.
Below are some steps Nibbi takes to ensure quality control and project success from start to finish.
Preconstruction
- Ensure waterproofing details are well-designed and cost-effective.
- Review drainage design at planters and roofs to ensure the installation of effective systems with compatible products.
- Review wall assemblies.
- Review deck coatings and metal coatings.
- Work diligently with manufacturers to assist the project team in product selection, design, and installation requirements.
Pre-Task
- Hold Pre-Task Meetings to review approved products and manufacturer’s installation procedures before the start of a task.
- Manufacturers’ representatives perform site visits to review substrate conditions before the installation of their products and provide letters of compliance.
- Mock-ups are built to demonstrate the required level of workmanship and proposed range of aesthetic effects through a consensus from architects.
Construction
- Perform site inspections for tasks including, but not limited to: waterproofing, window installation, roofing, and coating installations.
- Manufacturer’s representatives perform site visits to review installations and provide compliance letters.
- Provide oversight during water testing of windows, storefronts, and wall assemblies.
- Work with architects to develop required details.
Post-Construction
- Perform final building/site walk-throughs and verify installed systems are performing per contract requirements.
- Perform close-out training on all building systems, such as mechanical, electrical, plumbing, and landscaping irrigation systems.
- Provide training videos and electronic Operations and Maintenance Manuals to the client.
- Assist Building/Maintenance Managers with warranty issues.