News + Events

September 27, 2019

3268 San Pablo

Posted by: Nibbi Brothers | Share | Comments Off on 3268 San Pablo

3268 San Pablo is an affordable rental housing development of 51 apartments for low-income seniors. It is located on a 0.26-acre infill site along a major transit corridor in West Oakland, adjacent to another SAHA housing property, St. Andrews Manor. The building is a five-story wood frame structure over a concrete podium parking garage. Ground […]

September 26, 2019

Redwood Oaks Renovation

Posted by: Nibbi Brothers | Share | Comments Off on Redwood Oaks Renovation

Rehabilitation of 36-unit apartment complex that houses low-income families and individuals. interior work (new kitchen, baths, flooring, paint, appliances, bath fans, electrical upgrade) and exterior work (roofs, windows, seismic strengthening, paint, landscape and parking lot improvements) and a new community room building.

September 26, 2019

2515 El Camino Real

Posted by: Nibbi Brothers | Share | Comments Off on 2515 El Camino Real

This new development is a 3-story mixed-use building in Palo Alto.  The building includes one underground parking level, commercial space, and 13 market rate residential units.

September 26, 2019

Bright Horizons

Posted by: Nibbi Brothers | Share | Comments Off on Bright Horizons

The Bright Horizons project is located in the City Center retail complex on Geary Boulevard. Nibbi is currently building the 2-story structure which will house the future day care center. Project scope includes build out of interior spaces, restrooms and other tenant improvements. The facility will be a total of 14,242 sq. ft. and will […]

September 26, 2019

420 Taylor

Posted by: Nibbi Brothers | Share | Comments Off on 420 Taylor

Located at the intersection of Taylor Street and O’Farrell Street, 420 Taylor is a four-story concrete structure built in the 1940s. The building features a 4th floor roof terrace and a central light which reaches down to the 2nd floor. This project consists of: remodeling existing basement and ground floors, addition of mezzanine, and a […]

July 15, 2019

1990 Folsom

Posted by: Nibbi Brothers | Share | Comments Off on 1990 Folsom

1990 Folsom will be a 143-unit affordable housing development. The building will transform an underutilized 29,047 square foot lot into a vibrant, mixed use community of affordable rental homes. The Project is comprised of 12,300 square feet of neighborhood Production Distribution & Repair (PDR) space, 4,500 SF of ground floor child care space, and 3,000 […]

February 26, 2019

California College of the Arts Student Housing

Posted by: Nibbi Brothers | Share | Comments Off on California College of the Arts Student Housing

The California College of the Arts will be a new 280 unit Student Housing Project located in SoMa on Hooper Street. The building will offer affordable housing for incoming students, allowing for collaboration and a comfortable place for students to work, live, and thrive. The new 140,000 sq. ft. building will include 520 beds and feature […]

January 25, 2019

490 South Van Ness

Posted by: Nibbi Brothers | Share | Comments Off on 490 South Van Ness

490 South Van Ness is a 7-story, Type I building with a total building area of approximately 82,000 sf. It will include 81 units of affordable housing, ground floor community spaces and a Rooftop Terrace. The project features a bike storage room, exterior courtyard, roof deck with planting space, outdoor seating and built in BBQ, […]

January 18, 2019

Mission Bay Block 3E

Posted by: Nibbi Brothers | Share | Comments Off on Mission Bay Block 3E

Mission Bay Block 3 East is a 4-story, a 119-unit affordable housing development for 56 low-income families and 62 veterans spanning 126,000 square feet across three buildings. The project is a wood-framed Type V construction over a concrete podium. Amenity spaces include: community room, multipurpose room, computer room, administrative and social services offices, community dining […]

December 7, 2017

Restoration Hardware Adaptive Reuse / Tenant Improvement

Posted by: Nibbi Brothers | Share | Comments Off on Restoration Hardware Adaptive Reuse / Tenant Improvement

Located at the corner of 20th and Illinois Streets in San Francisco, building 101 at Pier 70 is undergoing substantial rehabilitation and adaptive reuse to house the new Restoration Hardware flagship store. The  70,000 sq.ft. space includes a new green roof pavilion and tenant improvements associated with building-out the interior of the new showroom. The […]