
|
Construction of a 407-stall parking garage for the city of Mountain View. |
Fruitvale
Station This project consisted of the demolition of the existing Del Monte Cannery site and the conversion of the land into a large retail complex |
|||
|
Boudin at the Wharf Nibbi Brothers was the general contractor for the new flagship retail destination at Fisherman's Wharf. |
Pier One Renovation of historic Pier One on San Francisco's Embarcadero. |
|||
|
Cliff
House Nibbi Brothers was proud be an integral part of this important project, the renovation of the historic Cliff House. |
NorCal Waste Systems iMRF Nibbi is constructing the NorCal Integrated Material Recovery Facility (IMRF). |
|||
|
San Francisco Zoo Part of the $100M bond measure to upgrade the City zoo. |
Byer Garment Warehouse A new 2-story poured-in-place concrete warehouse. The project was negotiated with the building owner. |
|||
![]() |
Wax Museum Nibbi Brothers was selected by the owners of the Wax Museum to provide pre-construction services and build a new retail building on the site of the old Wax Museum |
128 King Street 128 King Street, a historic brick warehouse originally built in 1913, is located directly across from AT&T Park. |
||
![]() |
4-story, 225-stall parking garage with 12,400 SF of ground-level retail space. |
![]() |
Mountain View Parking Garage Nibbi Brothers built this new 3-level parking garage for the City of Mountain View's Planning Department |
|
![]() |
Redwood City Parking Garage consists of three new buildings totaling over 97,000 SF located in Foster City |
![]() |
SF General Hospital Parking Garage Nibbi was the successful bidder on this four story, 811-car parking garage. |
|
|
Holy Trinity This project consisted of the new construction of a 21,000 SF athletic center for the Holy Trinity Greek Orthodox Church |
Rockridge
Branch Library The Rockridge Branch Library project consisted of a 2 story steel frame and concrete structure |
|||
|
Caltrain
Station Improvements The majority of this project consisted of a new glass and steel, fully enclosed concourse |
![]() |
San
Leandro Civic Center The project consisted of the new construction of a 2 story structural steel building with high end finishes to match existing art deco |
||
![]() |
Mission Police Station Nibbi Brothers was the low bidder and awarded the contract from the City to build this new district police station |
![]() |
South San
Francisco Conference Center This project was a seismic upgrade and expansion of an existing concrete tilt-up building. |
|
|
Laurel
Grove 16,000 SF addition and a 29,000 SF remodel of existing hospital space |
![]() |
Candlestick Park Luxury Suite Remodel consisted of the remodeling and extension of the upper deck mezzanine of the stadium |
Corporate Profile
| Current Projects |
Completed Projects |
News |
Employment | Home
|