SPUR Urban Center

Pre-construction of 4-story urban center in downtown San Francisco.  

 

USPS 3rd Floor Infill

Tenant improvement work at the Oakland distribution center of the USPS.

Porziuncola

Replication of 13th century chapel where St. Francis founded his church.

 

   

St. Anthony Social Services Building

Nibbi begins work on new medical office building for the St. Anthony Foundation

Local 261

New hiring hall with meeting and training space for the Laborer's International, Local 261.

 

Fruitvale Station
This project consisted of the demolition of the existing Del Monte Cannery site and the conversion of the land into a large retail complex

Mission Creek Maintenance

Single story steel frame building in San Francisco.

 

Pier One
Renovation of historic Pier One on San Francisco's Embarcadero.

Mt. View Parking

Construction of a 407-stall parking garage for the city of Mountain View.

 

NorCal Waste Systems iMRF
Nibbi is constructing the NorCal Integrated Material Recovery Facility (IMRF).

Boudin at the Wharf
Nibbi Brothers was the general contractor for the new flagship retail destination at Fisherman's Wharf.
 

Byer Garment Warehouse
A new 2-story poured-in-place concrete warehouse. The project was negotiated with the building owner.

Cliff House
Nibbi Brothers was proud be an integral part of this important project, the renovation of the historic Cliff House.
 

128 King Street
128 King Street, a historic brick warehouse originally built in 1913, is located directly across from AT&T Park.

San Francisco Zoo
Part of the $100M bond measure to upgrade the City zoo.
  Mountain View Parking Garage
Nibbi Brothers built this new 3-level parking garage for the City of Mountain View's Planning Department
Wax Museum
Nibbi Brothers was selected by the owners of the Wax Museum to provide pre-construction services and build a new retail building on the site of the old Wax Museum
  SF General Hospital Parking Garage
Nibbi was the successful bidder on this four story, 811-car parking garage.
 

Hollister Parking

4-story, 225-stall parking garage with 12,400 SF of ground-level retail space.

 

Rockridge Branch Library
The Rockridge Branch Library project consisted of a 2 story steel frame and concrete structure
Redwood City Parking Garage
Four story, 403-car parking garage built for the City of Redwood.
  San Leandro Civic Center
The project consisted of the new construction of a 2 story structural steel building with high end finishes to match existing art deco

Holy Trinity
This project consisted of the new construction of a 21,000 SF athletic center for the Holy Trinity Greek Orthodox Church
  South San Francisco Conference Center
This project was a seismic upgrade and expansion of an existing concrete tilt-up building.

Caltrain Station Improvements
The majority of this project consisted of a new glass and steel, fully enclosed concourse
  Candlestick Park Luxury Suite Remodel
consisted of the remodeling and extension of the upper deck mezzanine of the stadium
Mission Police Station
Nibbi Brothers was the low bidder and awarded the contract from the City to build this new district police station
 

Laurel Grove
16,000 SF addition and a 29,000 SF remodel of existing hospital space
         

Corporate Profile | Current Projects | Completed Projects | News | Employment | Home

All logos and images are property of Nibbi Bros., Inc. Copyright © 2002
For any questions please email webmaster@nibbi.com